United Kingdom > London > London > London > Tower Hamlets > Arrowhead Quay
Find Building

Arrowhead Quay

 

Images

Building Rating

Other Information

  • Since its original proposal the design has changed to increase floor-space. This has included changing the appearance to visually eliminate the exposed core that was previously visible.
  • Consisting of two interlocking blocks between a central core, the shorter section was boosted in height by the architects, Skidmore Owings and Merrill.
  • The result of these changes are the above grade lettable areas has increased from 45,887 square metres to 51,335 sq m, an increase of about 12%.
  • The total length of construction has been scheduled at 112 weeks starting from the 5th of March 2007.

Companies

If your company has been involved with the Design/Build, Supply or Maintenance of this building please submit your details.

Architect
Skidmore Owings & Merrill
Developer
Ballymore Properties
Planning Consultant
Cartman Ltd

Reference Data

Reference No.
86
First Uploaded
19-02-2006
Last Editorial Date
01-08-2008
 

Building Location

Address
Marsh Wall, Isle of Dogs, London. E14
Council
Tower Hamlets
County
London
Region
London
Country
United Kingdom

View in Google Maps

Building Specification

Status
On Hold
Proposal date
2001
Construction start date
2007
Completion date
2009

Roof Height (AGL)
113.00

Arrowhead Quay

Total Floors (O.G)
26

Market Data

Primary Use
Office

Floorspace (sq m)
51,335.00

Metres > Feet