Images
Building Rating Other Information
- There is already full planning permission for a 183m tall tower on this building, near identical to the new proposal but four floors shorter.
- The major difference between the original proposal and the taller one is increased levels of environmentally efficient technology that are deployed by the developer including improved solar shading in the cladding and solar power.
- The tower is designed to appear different from each direction with little symmetrical design.
- The tower is designed to be split vertically into sets of three floors for clients to occupy.
- The south side of the tower will have visible lifts running up it. This side is also the location of the core, so positioned to provide shading from the sun for the structure and reduce air conditioning costs.
- In early 2006 work had begun on dealing with the sewers that run under the site to help accommodate the extra weight a tower will bring.
- 2008 saw changes made to the proposals in the form of a shorter spire that would have a height of 28 metres above the roof level rather than the previous 44.
News Articles
22-07-2010 > Heron Tower Gets Its Spire 12-04-2010 > Heron Tower Tops Out 10-07-2009 > Heron Plan 149m Tall Luxury Hotel 28-05-2009 > First Cladding Goes On Heron Tower 15-04-2009 > Heron Continues Despite Contractor Problems 24-02-2009 > Catching Up With Heron Tower 01-10-2008 > The Latest On Herons Construction 29-04-2008 > Heron Tower Finally Under Construction 31-10-2007 > Skanska Win Heron Tower Contract 24-07-2007 > Demolition Begins On Heron Tower Site 24-11-2006 > Heron Secures Equity Bishopsgate Tower Sold Companies
- Architect
- Kohn Pedersen Fox Associates
- Developer
- Heron International PLC
- Structural Engineer
- Arup Associates
- Services Engineer
- Foreman Roberts
- Main Contractor
- Skanska
- Quantity Surveyor
- Davis Langdon LLP
Reference Data
- Reference No.
- 59
- First Uploaded
- 19-02-2006
- Last Editorial Date
- 30-07-2010
|
|
- Address
- 110 Bishopsgate, London. EC3
- Council
- City of London
- County
- London
- Region
- London
- Country
- United Kingdom
View in Google Maps Available office space in EC3
Avanta - Lime Street, Lime Street, Monument Landmark - Holland House, Bury Street, The City MWB City Exec - Finch Lane, Finch Lane, Bank Find Other Offices - Status
- Under Construction
- Proposal date
- 2005
- Construction start date
- 2008
- Completion date
- 2011
- Style
- Structural Expressionist
- Pinnacle Height (AGL)
- 230.00
- Pinnacle Type
- Antenna
- Roof Height (AOD)
- 218.22
- Roof Height (AGL)
- 202.52
- Top Floor Height (AGL)
- 173.00

- Total Floors (O.G)
- 46
- Plant Floors
- 6
- Total Floors (U.G)
- 3
Market Data
- Primary Use
- Office
- Secondary Use
- Retail
- Floorspace (sq m)
- 63,100.00
- Car Parking Spaces
- 8
- Construction Cost
- £185,000,000.00
- Budget Date
- 2003
Metres > Feet |