- This and the attached low-rise tower are the last phases of the Broadgate Centre.
- Design work on a building for this site originally began in 1991 and went through numerous options before settling for a tower.
- Broadgate Tower will be built on a raft weighing 6,000 tonnes over the rail tracks that run above it to Liverpool Street Station. This means there is a requirement to distribute the weight of the tower, and hence no concrete core.
- The a-frames that express the structure are one of the by-products of the lack of a central core with the outside of the building providing structural strength, clearly shown off infront of the glass and steel cladding.
- There will be 14,000 tonnes of steel used, 877 steps in the staircases, 40,000 square metres of glass cladding which is the equivalent of 154 tennis courts and the view from the top will be 45 kilometres.
- The diagonal cross bracing references various SOM buildings in Chicago such as the Hancock Tower.
- The lift supplier for the building is the Finnish company Kone who will install the first double decker lifts to be used in the U.K.
News Articles
15-04-2010 > Twin Peaks Challenge 13-02-2007 > 201 Bishopsgate Pre Let 12-10-2006 > Broadgate Tower Could Get Tall Neighbour 23-09-2005 > Quick Start Expected For Broadgate Tower 27-07-2005 > City Approves British Land Broadgate Project 04-03-2005 > Broadgate Tower For Spec Build 22-02-2005 > 201 Bishopsgate Makeover 22-12-2003 > British Land Plan City Building Spree Companies
- Architect
- Skidmore Owings & Merrill
- Developer
- British Land
- Structural Engineer
- Skidmore Owings & Merrill
- Services Engineer
- Jaros, Baum & Bolles
- Main Contractor
- Bovis Lend Lease
- Quantity Surveyor
- Davis Langdon LLP
- Planning Consultant
- DP9
See other involved contractors Reference Data
- Reference No.
- 1639
- First Uploaded
- 19-02-2006
- Last Editorial Date
- 31-03-2009
|
|
- Address
- 201 Bishopsgate, Broadgate, London. EC2
- Council
- City of London
- County
- London
- Region
- London
- Country
- United Kingdom
View in Google Maps Available office space in EC2
MOS - Moorgate, Moorgate, Moorgate MWB City Exec - London Wall Buildings, London Wall Buildings, Liverpool Street MWB - City Tower, Basinghall Street, Bank Find Other Offices - Status
- Complete
- Proposal date
- 2005
- Construction start date
- 2005
- Completion date
- 2008
- Roof Height (AOD)
- 178.40
- Roof Height (AGL)
- 164.30

- Total Floors (O.G)
- 35
- Plant Floors
- 1
- Total Floors (U.G)
- 2
Market Data
- Primary Use
- Office
- Secondary Use
- Retail
- Floorspace (sq m)
- 37,000.00
- Construction Cost
- £191,000,000.00
- Budget Date
- 2008
Metres > Feet |